page_banner

Peanut Butter Mill Repair and Maintenance

Peanut Butter Milling Machine structure reasonable, simple, and easy to operate, when using it, no need special maintainance and service. The equipment will require regular wear of the rotor, the fineness of materials processing, such as seals seal project to be checked.

1、stator Disassemble

Turn the filler hopper counterclockwise and remove, remove the O-ring and gasket, remove the inlet and outlet nozzles. Loosen the cap screws and remove the retaining ring and gasket. Rotate the adjusting ring counterclockwise and remove it, take out the sealing gasket. Lift the stator bracket and stator assembly upward.

Rotate the adjustment ring and remove, remove the gasket. Make up the stator and the stator bracket combination.

Unscrew the hex screws, remove the spring washer, separate from the stator bracket, remove the two 0-ring.

Stator assembly, according to the above reverse order.

Before assembly, each component should be cleaned.

Installation, you need to screw in the contact area and meet the

requirements of the oil spread on the area.

When removed after the hopper and out of faucets, you can also adjust the ring counter-clockwise rotation, the fixed ring, adjusting the ring and the stator assembly of the stator support a combination of all out, then the light of the above order of demolition of the stator.

Notes: the stator assembly can not be seperated

图片1

2、rotor disassemble

Remove the hopper:Under the special wrench with L-bolt, remove the spring washer, the rotor

lid and O-ring.Screw a screw with a special rotor M27 × 2 thread hole, the top of the rotor assembly.

Remove the bracket ring and O-ring。

图片2

Note: The rotor assembly 1, 2, 3 rotor and the centrifugal disk is absolutely indecomposable.

Rotor assembly, in accordance with the above reverse order.

Before assembly, each component should be cleaned.

Installation, you need to screw in the contact area and meet the requirements of the oil spread on the area.

3、 main sets spare parts disassembly

The part of the disassembly order as follows.

① pin - hex bolts - the main seat.

② Screws - set-O-ring seal.

③ set screws - centrifugal chip-O-ring

④ shutter - release top of the bolt - loosen the tape triangle - triangle tape.

⑤ hex bolts - Block Body

Assembly in accordance with the above reverse order.

4、Block Body

Block body as shown in the demolition

and assembly.

Note:Use lithium grease bearings.

图片4

图片3


Post time: May-20-2024